
Bathroom stripped & prepared for renovation.

Finished with marble tiles, shower & toilet

New internal door fitted and finished.

Shower fitted with marble effect wall panels.

Toilet & basin fitted with electric tap.

Sunken whirlpool bath & shower with travertine tiles.

Twin basins with taps & vanity units.

Kitchen prepared and ready for the next stage of installation.

Completed with copper splashback, oak worktop & sink.

Prep sink, induction hob & char-grill installation.

Alternative view of the cooking and prep area.

3 Column Radiator with copper up-stands.

Plumbing with waste pipework and dishwasher connection.

Mock oak beam around internal opening.

Quick-Step laminate flooring installation.

Bespoke kitchen hood with extractor fan.

White metro tile kitchen splashback with decorative border tiles

Butcher's block, bespoke cooker hood & tiled splashback.

Kitchen renovation with open-plan dining area.

Room before flooring installation.

Underlay ready for flooring.

Quick-Step laminate flooring completed.

Ceramic tiled floor installation.

Solid oak floor installation.

Finished oak flooring.

Floor before installation.

Finished marble effect laminate flooring.

Floor before installation.

Finished marble effect laminate flooring.

Room before soundproof wall installation.

Stud work for soundproof wall ( resilient bars optional )

Rockwool sound block insulation fitted between studs.

Double boarded soundbloc plasterboard installed.

Acoustic sealant applied before the wall was skimmed.

Bespoke wall panelling & Engineered wood flooring.

Wall panelling continued onto second feature wall

Soundproof wall before final skim.

Soundproof wall after final skim.

Acoustic vertical slat wall panelling.

With wall mounted TV & electric fire.

Gazebo before roof upgrade.

Upgraded with stormproof polycarbonate sheeting, guttering & additional roof rafters.
Outdoor area before installation work.

Installed aluminium gate, canopy & composite floor tiles.

View from above.
Timber steps during construction.

Completed with bannister and decking.

Alcove preparation during installation.

Finished with bespoke timber shelving.

Mock beam, matching door surround & fire door side light.

New stair spindles fitted to existing staircase.

Painted with new window architrave & panelling.

Bespoke mirror with lead strip and custom made timber frame.

Made to measure bar during construction.

Completed with cast iron inserts, footrests & medium oak stain.

Fireplace surround during construction .

Completed with cast iron inserts and brick slips.

Bespoke architrave & paneled cased opening

Close up of detailing.
Mon | 09:00 am – 05:00 pm | |
Tue | 09:00 am – 05:00 pm | |
Wed | 09:00 am – 05:00 pm | |
Thu | 09:00 am – 05:00 pm | |
Fri | 09:00 am – 05:00 pm | |
Sat | 09:00 am – 05:00 pm | |
Sun | Closed |
I aim to respond to all enquiries within 24 hours to discuss your requirements and arrange a site visit.